Expert Witness (Garage conversion to disability living space) - Cardiff
In 2016 I took part in an expert witness project, we inspected a property in South Wales. Carried out a destructive investigation of the floors / walls / ceilings. More info to follow.
(RCA) Reinstatement Cost Assessment
In 2016 I carried out a Reinstatement Cost Assessment for a block of flats in Bristol. More info to follow.
Flat Roof Rear Extension @ Bristol
In 2016 I produced drawings for a flat roofed rear extension in Bristol. The planning was approved. The process involved complaints from the neighbouring property in regards to right of light etc... More info to follow.
Berkeley Castle Estate - Collapsing Wall
Back in 2016 I attended one of the properties on the Berkeley Castle Estate to inspect a collapsing historic wall to provide the Castle Trustees with advice on suitable repair and procedure. More info to follow.
Condition Survey of a Boat @ Bristol Harbourside
Took part in a condition survey @ Bristol Harbourside. More to follow.
Repairs to Berkeley Castle Estate Kennels
In 2016 I attended the Estate Kennels of Berkeley Castle with FRICS Chris Easton to inspect two buildings with collapsing walls to recommend repairs. More info to follow.


1600s Watermill converted to Micro-Brewery, 9 flats & 6 offices.
Back in 2016 I was involved with the proposed change of use of an old listed watermill. I produced drawings for a new Micro-Brewery on the ground floor level (flood zone), and then 9 flats & 6 offices on the first and second floors. Wonderful historic project and very pleased to say that I created the design.
Basic Rear Balcony Extension @ Bristol
In 2016 I produced drawings for a basic rear first floor balcony looking over the clients garden. The planning was approved! More info to follow.
Measured Building Survey of an old bank in Weston-super-Mare
In 2016 I carried out a measured building survey and produced existing plans of an old NatWest Bank in Weston-super-Mare. More info to follow.
Lorry Car Park & Wash Site @ Newport
In 2016 I designed the layout for a large logistics company parking and wash site for 50 lorries. I also produced the drainage designs and gained approval to discharge into a local reen. More info to follow.