Fire Risk Assessment Block of Flats @ Bristol
In 2016 I took part in a Fire Risk Assessment of a block of flats in Bristol. More info to follow.
Expert Witness - Costing Conservatory demolition and rebuild
In 2016 I carried out costing for the demolition and rebuild of a conservatory project which went wrong. More info to follow.
Schedule of Works
More info to follow
Expert Witness - Swansea
In 2016 I assisted with an Experts Report on a newly constructed property in Swansea. More info to follow.
Berkeley Castle - Tapestry repairs
Back in 2016, I produced drawings for the recommended fitting of a historic tapestry at Berkeley Castle. During cleaning of the Castle Tapestry, consternation was caused when a live bot fly larvae was found. More info to follow.
New-build progress report
In 2016 I assisted a mortgage company by providing a progress report for a new-build construction project. More info to follow.
New build flats in Bristol City Centre
Carried out site visit, organised drainage survey to be carried out. More info to follow.
Topo Survey @ Newport
Carried out small topographical survey at a new site in Newport. The intention was to pick up various levels and positions to begin designing drainage for a new logistics parking site. More info to follow.
Large Garage to 1 Bed House Conversion @ Bristol City Centre
In 2016 I assisted with the removal of planning conditions for a large garage which had been converted into a 1 bedroom house. This involved a ground inspection (soil analysis). More info to follow.
Re-design of mine restoration plans to create Hydro-energy project
In Feb 2016 I redesigned the proposed restoration plans for a working mine in South Wales. The new design made huge savings in restoration costs. More info to follow.